Baldwin, MS- Phase 4

Baldwin, MS

Installed 12,000 tons of Rip Rap along a drainage ditch.
Built Aeriation Basin and Pump Station on the effluent line of lagoons.

 

Completed: Jan 2020
Project Amount: $1,068,942
Engineer: Engineering Solutions, Inc.