Baldwin, MS- Phase 4 Baldwin, MS Installed 12,000 tons of Rip Rap along a drainage ditch. Built Aeriation Basin and Pump Station on the effluent line of lagoons. Completed: Jan 2020 Project Amount: $1,068,942 Engineer: Engineering Solutions, Inc. Photo Gallery View All Projects